Wirebench
AWG, ft, °Fmm², m, °C

Wire run cost & copper vs. aluminum comparison

Compare material cost, voltage drop, annual I²R energy loss, and payback time between copper and aluminum conductors.

Run, pricing and load

$/ft
$/ft
ft
wires
Total wire: 600 ft
Phase
V
A
hr/yr
$/kWh
Simple payback & NEC compliance No result
Copper —
—
Enter run and pricing
Aluminum —
—
Enter run and pricing
— yr payback

Enter distance, unit prices, and load to compare copper and aluminum.

Total conductor length
—
Upfront material diff
—
Annual energy diff
—
Copper 25-yr total
—
Aluminum 25-yr total
—
25-yr lifecycle winner
—

Material, electrical loss, and lifecycle comparison

Metric Copper Aluminum Difference (Cu − Al)
—

IEC mode uses $/m unit pricing and meters for conductor length, with IEC 60228 resistance adjusted to 75 °C and conservative AWG equivalents for NEC ampacity checks.

Advertisement

How wire cost, I²R energy loss, and payback interact

Comparing copper and aluminum conductors requires evaluating both upfront material cost and ongoing resistive heat losses (I²R) over the operating life of the circuit. While copper has lower resistivity per unit area, aluminum typically carries a 40% to 65% lower upfront purchase price even when stepped up one or two AWG/kcmil sizes for equivalent ampacity.

Total wire length = Distance × Conductors in run Material cost = Total wire length × Unit price ($/ft or $/m) Circuit power loss (W) = N_active × I² × (R_75C × Distance_kft) [N_active = 2 for 1-phase/DC, 3 for balanced 3-phase; R_75C from NEC Ch. 9 Table 8] Annual energy cost ($/yr) = (Loss_W / 1000) × Operating_hours × Electricity_rate Simple payback (years) = Upfront_cost_premium / Annual_energy_savings Total lifecycle cost (T) = Material_cost + (Annual_energy_cost × Years)
Termination & compatibility reminder (NEC 110.14): Aluminum conductors must be terminated on lugs rated AL/CU or AL7CU/AL9CU (75 °C or 90 °C), torqued to manufacturer specifications, and treated with listed anti-oxidant compound when required by the equipment listing.

Three worked copper vs. aluminum cost comparisons

Example 1: 80 A subpanel feeder at 200 ft — 4 AWG Cu vs. 2 AWG Al

A 240 V 1-phase feeder carries 65 A for 2,500 hr/yr at $0.15/kWh over 200 ft (3 conductors = 600 ft total). 4 AWG Cu ($2.20/ft) is compared against equivalent-ampacity 2 AWG Al ($0.95/ft).

Copper (4 AWG, R = 0.308 Ω/kft): Material = 600 × $2.20 = $1,320 | Drop = 3.34% | Loss = 520.5 W ($195.19/yr) Aluminum (2 AWG, R = 0.319 Ω/kft): Material = 600 × $0.95 = $570 | Drop = 3.46% | Loss = 539.1 W ($202.16/yr) Upfront Al savings = $750 | Annual Cu energy advantage = $6.97/yr | Payback = 107.6 yr

Because 2 AWG aluminum has nearly the same resistance as 4 AWG copper, aluminum saves $750 upfront and remains $576 ahead even after 25 years of operation.

Example 2: Same-gauge comparison (conduit constrained) — 4 AWG Cu vs. 4 AWG Al

If an existing conduit limits the conductor size to 4 AWG and load is 60 A continuously (4,000 hr/yr at $0.20/kWh) over 150 ft (3 conductors = 450 ft):

Copper (4 AWG, R = 0.308 Ω/kft): Material = 450 × $2.20 = $990 | Loss = 332.6 W (1,330.6 kWh/yr = $266.11/yr) Aluminum (4 AWG, R = 0.508 Ω/kft): Material = 450 × $0.75 = $337.50 | Loss = 548.6 W (2,194.6 kWh/yr = $438.91/yr) Upfront Cu premium = $652.50 | Annual energy savings = $172.80/yr | Payback = 3.8 yr

At the same gauge under heavy continuous duty, copper’s lower resistance cuts wasted heat by 40% and pays back its material premium in 3.8 years.

Example 3: 200 A 3-phase commercial feeder at 300 ft — 3/0 AWG Cu vs. 250 kcmil Al

A 480 V 3-phase feeder carries 160 A for 3,000 hr/yr at $0.14/kWh over 300 ft (4 conductors = 1,200 ft total). 3/0 AWG Cu (200 A @ 75 °C, $7.80/ft) is compared against 250 kcmil Al (205 A @ 75 °C, $2.45/ft).

3/0 AWG Cu (R = 0.0766 Ω/kft): Material = $9,360 | Drop = 1.33% | Energy = $740.66/yr 250 kcmil Al (R = 0.0847 Ω/kft): Material = $2,940 | Drop = 1.47% | Energy = $818.98/yr Upfront Al savings = $6,420 | Annual energy diff = $78.32/yr | Payback = 82.0 yr

Both choices remain well under the 3% feeder drop guideline; 250 kcmil aluminum saves $6,420 upfront and saves $4,462 net over 25 years.

Frequently asked questions

Why is aluminum feeder wire usually much cheaper than copper even when upsized two gauges? Aluminum has roughly 61% of copper’s conductivity, requiring a one- to two-size increase in AWG/kcmil, but its lower density and commodity price per pound typically yield 40% to 65% material savings on larger feeders.
Does aluminum wire waste more electricity per year than equivalent-ampacity copper? When upsized two AWG steps for equal ampacity (e.g., 2 AWG Al vs. 4 AWG Cu), DC resistance per 1,000 ft is nearly identical, so annual I²R energy losses and voltage drop are also nearly identical.
When does copper pay back faster against aluminum? Copper achieves quick payback (under 5 years) when both options use the same wire gauge, when high continuous currents run 4,000+ hours per year, or where electricity rates are high.

Related calculators and reference charts

Cu vs. Al payback —
No result View