Wirebench
AWG, ft, °Fmm², m, °C

Solar PV string and array wire size calculator

Size PV source and output conductors using NEC 690.8 1.56x Isc current scaling, rooftop conduit derating, cold-weather Voc string limits, and 1%–2% voltage drop.

PV array and site parameters

Common solar array presets
A
A
V
V
mods
str
1 string = PV source circuit
%/°C
°F
°F
Rooftop conduit clearance (NEC 310.15(B)(2))
Effective conduit ambient: 104 °F (40.0 °C)
CCC
2 wires = 1 string (+ and -)
Conductor
ft
%
Voltage drop preset
Minimum PV conductor size (90 °C PV Wire / THWN-2) No result
— Copper PV / THWN-2

Enter module STC ratings, string count, and rooftop conditions.

Cold-weather Voc limit (690.7) —
Checks cold-corrected string open-circuit voltage against inverter/MPPT DC rating.
690.8(B) ampacity & rooftop derate —
Checks 1.56x Isc at 75 °C terminals and 1.25x Isc after ambient and bundling derating.
1.56x Isc design (690.8)
—
Cold Voc / Vmp array
—
Derated 90 °C ampacity
—
Voltage drop (at Vmp)
—
DC power loss / OCPD
—
Min EMT / EGC (250.122)
—

String summary and conductor comparison

Size 75 °C term. 90 °C derated Drop % Volts lost Power lost Status

IEC mode uses conservative AWG equivalents from NEC Table 310.16 for ampacity and IEC 60228 resistance adjusted to conductor operating temperature for voltage drop.

Advertisement

NEC Article 690 solar PV conductor and string sizing method

Solar photovoltaic circuits experience sustained high irradiance, elevated rooftop conduit temperatures, and cold-morning open-circuit voltage spikes. NEC Article 690 requires checking thermal ampacity, rooftop derating, cold Voc limits, and DC voltage drop together.

Maximum circuit current (690.8(A)): I_max = Isc × N_parallel × 1.25 Continuous conductor/OCPD factor (690.8(B)): I_156 = I_max × 1.25 = Isc × N_parallel × 1.56 Terminal & unadjusted check: I_75C ≥ I_156 (110.14(C)) Rooftop derated check (90 °C): I_90C × f_temp × f_bundle ≥ I_max (690.8(B)(1)) Cold-weather Voc (690.7(A)): Voc_cold = N_series × Voc_stc × [1 + (β/100) × (T_min_C - 25)] DC voltage drop: %VD = (2 × I_mp_total × R × L / 1000) / Vmp_string × 100

Why two ampacity checks? Under NEC 690.8(B)(1), you do not stack the 1.25 continuous factor on top of rooftop ambient/bundling derating unless an overcurrent device requires protection at its rating. Conductors must satisfy both the unadjusted 1.56x Isc requirement (capped at 75 °C equipment terminals per 110.14(C)) and the 1.25x Isc requirement after applying 90 °C Table 310.15(B)(1) ambient correction and 310.15(C)(1) bundling factors. Where 3 or more parallel strings are combined in a combiner box, string fuses rated at least 1.56x Isc (per module max series fuse rating) are required.

Target 1%–2% DC voltage drop: While NEC 210.19 informational notes suggest 3% for general branch circuits, solar PV designers target 1% to 2% DC drop from array to inverter because every watt lost in string wiring reduces daily energy harvest and can push MPPT trackers below optimal voltage on hot roofs.

Quick reference: 1.56x Isc and 90 °C rooftop derating (Copper)

Circuit Isc 1.25x Imax 1.56x (690.8) Std OCPD Min Cu (30 °C) Cu @ 60 °C, 4 CCC Cu EGC (250.122)

Three worked solar PV sizing examples

Example 1: Residential 10-panel 600 V rooftop string in conduit, 80 ft

Ten 400 W modules (Isc = 11.5 A, Imp = 10.8 A, Voc = 49.5 V, Vmp = 41.5 V, β = -0.28%/°C) run 80 ft through 3/4" EMT raised ≥ 7/8" above a roof at 104 °F (40 °C) ambient with 2 strings (4 CCC) in the conduit and a -10 °C (14 °F) winter low.

Cold Voc = 10 × 49.5 × [1 + (-0.0028) × (-10 - 25)] = 495 × 1.098 = 543.5 V (≤ 600 V, pass) NEC 690.8 1.56x Isc = 11.5 × 1.56 = 17.94 A; I_max = 11.5 × 1.25 = 14.38 A 10 AWG Cu (90 °C = 40 A): 40 × 0.91 (40 °C) × 0.80 (4 CCC) = 29.12 A ≥ 14.38 A; 75 °C = 35 A ≥ 17.94 A DC drop (10 AWG Cu @ 415 Vmp, 10.8 A, 80 ft): 2 × 10.8 × 1.24 × 0.080 / 415 = 0.52% (≤ 2%, pass)

10 AWG copper THWN-2 / PV Wire passes both the 690.8 ampacity/derating rules and stays well under the 2% voltage drop limit (only 0.52% loss, 21.4 W).

Example 2: Cold-weather Voc overvoltage check at -25 °C (-13 °F)

Suppose a designer puts 12 of the same 49.5 V Voc modules in series on a residential 600 V inverter in a northern climate where record winter lows hit -25 °C (-13 °F).

STC string Voc = 12 × 49.5 V = 594.0 V (looks under 600 V on paper!) Cold correction factor = 1 + (-0.0028) × (-25 - 25) = 1 + 0.140 = 1.140 (+14.0%) Cold Voc = 594.0 V × 1.140 = 677.2 V (> 600 V NEC 690.7(A) FAIL!) Max modules under 600 V = floor(600 / (49.5 × 1.140)) = floor(10.63) = 10 modules

Even though 12 panels have an STC Voc of 594 V, cold winter temperatures drive open-circuit voltage to 677.2 V—violating NEC 690.7 and risking inverter failure. Reduce the string to 10 modules (564.3 V at -25 °C) or split into two 6-module strings.

Example 3: 3-string combined PV output circuit, 220 ft ground mount (1.5% drop)

Three parallel strings of 500 W panels (Isc = 13.8 A, Imp = 13.0 A, Vmp_string = 360 V) combine in a DC combiner box and feed an inverter 220 ft away with a strict 1.5% DC voltage drop target.

Combined current: Isc_total = 3 × 13.8 = 41.4 A; Imp_total = 3 × 13.0 = 39.0 A NEC 690.8 1.56x Isc = 41.4 × 1.56 = 64.6 A → 70 A DC breaker / disconnect 75 °C Cu ampacity min: 4 AWG Cu = 85 A (6 AWG Cu = 65 A passes 64.6 A, but drop at 220 ft is 2.34% > 1.5%) 4 AWG Cu drop = 2 × 39.0 × 0.308 × 0.220 / 360 = 1.47% (≤ 1.5%, pass)

While 6 AWG copper satisfies the 64.6 A ampacity requirement, voltage drop over 220 ft pushes the design up to 4 AWG copper (1.47% drop, 206 W loss) with an 8 AWG copper EGC per NEC 250.122 (or 6 AWG if upsized per 250.122(B)).

Frequently asked questions

Why does NEC 690.8 multiply solar panel Isc by 1.56 to size PV wire? NEC 690.8(A)(1) applies a 1.25 factor to Isc for peak solar irradiance above STC, and 690.8(B)(1) applies a second 1.25 continuous-duty factor (1.25 × 1.25 = 1.5625, or 1.56x) for unadjusted ampacity and overcurrent device sizing.
How does rooftop conduit ambient temperature derating work for solar PV? Derating factors from NEC Table 310.15(B)(1) and 310.15(C)(1) apply to the 90 °C ampacity column for THWN-2 / PV Wire against the 1.25x Isc maximum current. Conduit mounted closer than 7/8 inch above a roof surface requires a +33 °C (+60 °F) ambient adder per NEC 310.15(B)(2).
Why must solar string Voc be checked at the coldest expected temperature? PV module Voc increases in cold weather according to the module's negative temperature coefficient (β_Voc). Under NEC 690.7(A), the cold-corrected Voc must stay below the inverter, charge controller, and NEC 600 V / 1000 V / 1500 V system limit.

Related calculators and reference charts

PV Wire / Cold Voc —