Subpanel feeder wire and conduit calculator
Size 50A–200A garage, shop, and indoor subpanel feeders comparing Copper THWN-2/UF-B vs. Aluminum XHHW-2/MHF/SER, 4-wire NEC 250.32 grounding, and burial depth.
Subpanel feeder parameters
Select subpanel breaker amperage, distance, and wiring method.
- Cu EGC (250.122 / B)
- —
- Al EGC (250.122 / B)
- —
- Min conduit (Cu / Al)
- —
- Min trench depth (300.5)
- —
Materials take-off & NEC 250.32 checklist
| Item | Copper option | Aluminum option | Quantity / Spec |
|---|
| Subpanel | Cu THWN-2 (75 °C) | Al XHHW-2 / SER (75 °C) | Cu EGC (250.122) | Al EGC (250.122) |
|---|
Subpanel feeder sizing: NEC 310.16, 250.32, 250.122(B), and Table 300.5
Feeding a 50 A to 200 A subpanel in a detached garage, workshop, ADU, or secondary interior distribution panel requires balancing conductor ampacity, cable insulation temperature limits, voltage drop over long trenches, and strict four-wire grounding and neutral isolation rules.
Feeder ampacity (Table 310.16): Conductors must carry ≥ Feeder Breaker Rating (310.12 83% rule does NOT apply unless feeding entire dwelling)
Voltage drop check: %VD = (K × I_expected × R_table8 × L / 1000) / V × 100 ≤ 3% feeder target
Upsized EGC (NEC 250.122(B)): EGC_cmil ≥ Table250.122_cmil × (Installed_Phase_cmil / Ampacity_Min_Phase_cmil)
Burial depth (NEC Table 300.5): RMC/IMC = 6 in | PVC Sch 40/80 = 18 in | Direct-burial UF-B/MHF = 24 in
Copper THWN-2 / UF-B vs. Aluminum XHHW-2 / MHF / SER: Copper offers smaller conduit sizes and familiar terminations, while aluminum XHHW-2, Mobile Home Feeder (MHF), and SER cable routinely save 50% to 70% on material cost for 100 A to 200 A runs. Watch two critical temperature-column traps: Copper UF-B direct-burial cable (up to 6 AWG) and interior NM-B are limited to the 60 °C column under NEC 340.80 and 334.80 (making 6 AWG Cu UF-B good for only 55 A, not 65 A), whereas individual THWN-2 or XHHW-2 conductors in conduit and MHF/SER cables on 75 °C lugs use the 75 °C column (though SER enclosed in thermal insulation drops to 60 °C per NEC 338.10(B)(4)(a)). Additionally, MHF/USE-2 cable without a dual RHH/RHW-2 flame-retardant rating cannot run exposed inside buildings beyond the immediate entrance point.
NEC 250.32 four-wire detached building rules: Every modern subpanel feeder requires four conductors—two ungrounded hot legs, an insulated grounded neutral conductor, and a dedicated equipment grounding conductor (EGC). Inside the subpanel, remove the green bonding screw or strap so the neutral bar stays completely isolated from the metal cabinet and the separate ground bar. For any detached building or structure, NEC 250.32(A) also mandates a local grounding electrode system (such as two 8-foot copper-clad ground rods driven at least 6 feet apart and bonded to the subpanel ground bar via a continuous 6 AWG copper GEC per Table 250.66). Always remember that whenever voltage drop forces you to upsize the hot conductors, NEC 250.122(B) requires upsizing the EGC in direct circular-mil proportion.
Three worked subpanel feeder examples
Example 1: 100 A detached garage subpanel, 100 ft in PVC Schedule 40
A homeowner runs 100 ft underground in PVC Schedule 40 conduit to a detached garage 100 A subpanel expecting 80 A peak load (EV charger + tools) with a 3% voltage drop target.
Ampacity minimum (Table 310.16 @ 75 °C): 3 AWG Cu (100 A) or 1 AWG Al (100 A)
Voltage drop at 80 A, 100 ft, 240 V:
3 AWG Cu (0.245 Ω/kft): 2 × 80 × 0.245 × 0.100 / 240 = 1.63% (≤ 3%, pass)
1 AWG Al (0.253 Ω/kft): 2 × 80 × 0.253 × 0.100 / 240 = 1.69% (≤ 3%, pass)
EGC (Table 250.122 for 100 A): 8 AWG Cu or 6 AWG Al
Minimum PVC Sch 40 conduit (4 wires): 1-1/4" PVC (Cu: 3 × #3 + 1 × #8) or 1-1/4" PVC (Al: 3 × #1 + 1 × #6)
Choosing 1 AWG aluminum XHHW-2 (three 1 AWG conductors + one 6 AWG Al EGC) in 1-1/4" PVC Sch 40 buried 18 inches deep achieves a 1.69% voltage drop while cutting conductor cost substantially compared to 3 AWG copper.
Example 2: 60 A shed subpanel, 220 ft long run (Voltage drop + 250.122(B) EGC upsize)
A 60 A subpanel in a remote barn sits 220 ft from the main house, carrying 48 A continuous load at 240 V in PVC Sch 40 conduit within 3% drop.
Ampacity minimum (60 A @ 75 °C): 6 AWG Cu (65 A) or 4 AWG Al (65 A)
Drop at ampacity min (48 A, 220 ft):
6 AWG Cu = 4.32% (FAIL) → steps to 4 AWG Cu = 2.71% (≤ 3%, pass)
4 AWG Al = 4.47% (FAIL) → steps to 2 AWG Al = 2.81% (≤ 3%, pass)
250.122(B) EGC upsize:
Base EGC for 60 A = 10 AWG Cu (10,380 cmil) | 8 AWG Al (16,510 cmil)
Cu upsized = 10,380 × (41,740 / 26,240) = 16,511 cmil → 6 AWG Cu EGC (26,240 cmil)
Al upsized = 16,510 × (66,360 / 41,740) = 26,248 cmil → 4 AWG Al EGC (41,740 cmil, since 26,248 > 26,240 cmil of 6 AWG)
Distance forces stepping up one gauge to 4 AWG copper or 2 AWG aluminum, and NEC 250.122(B) bumps the EGC up accordingly in 1-1/4" PVC Sch 40.
Example 3: 200 A workshop subpanel, 65 ft indoor SER vs. EMT
An attached 200 A workshop subpanel is fed 65 ft indoors from a 200 A feeder breaker in the main panel (160 A expected load).
Table 310.16 @ 75 °C (200 A full subpanel): 3/0 AWG Cu (200 A) or 250 kcmil Al (205 A)
(Note: 4/0 Al is 180 A at 75 °C and only permitted for a 200 A main dwelling service per 310.12)
Voltage drop at 160 A, 65 ft: 250 kcmil Al = 2 × 160 × 0.0847 × 0.065 / 240 = 0.73%
EGC (Table 250.122 for 200 A): 6 AWG Cu or 4 AWG Al
Minimum EMT conduit (Al 3 × 250 XHHW + 1 × #4 Al): 2" EMT
Because this subpanel does not feed the entire dwelling, 4/0 aluminum is undersized for a 200 A breaker under Table 310.16; install 250 kcmil aluminum XHHW-2 (or 3/0 copper THHN) with a 4 AWG Al / 6 AWG Cu EGC.